01What a Request May Involve
A requirement may involve a drawing-based component, a specified material, a spare or replacement part, a fabricated item, a standard industrial component, or a package of related items. Feasibility depends on technical definition, quantity, documentation, supplier capability, and destination.
02Provide a Controlled Specification
Where applicable, provide drawings and revision status, material designation, dimensions and tolerances, quantity, standards, inspection or testing requirements, certificates, marking and traceability needs, packaging, destination, and schedule. The buyer should identify which requirements are mandatory and which permit alternatives.
03Evidence Must Match the Requirement
NTI can request and organize supplier information, material or inspection documents, and quotation exceptions. It does not certify a supplier, guarantee material conformity, or replace buyer approval, independent inspection, or laboratory verification where those controls are required.
04Ask for a Feasibility Review
Send the available technical package and commercial context. NTI will first assess whether the request is sufficiently defined for supplier development and whether important evidence or clarification is missing.
Ask for a feasibility review →